October 2008 meeting of SC-02-01
|
|
Audio Engineering SocietyStandards CommitteeNotice and agenda for the meeting of SC-02-01 Working Group on Digital Audio Measurement Techniques of the SC-02 Subcommittee on Digital Audio To be held in conjunction with the upcoming AES 125th Convention in San Francisco, CA., US., 2008-10. The meeting is scheduled to take place at the Moscone Convention Center. Please check the latest schedule at http://www.aes.org/standards/ - Introduction to working group and attendees
- Amendments to and approval of agenda
- Approval of report of previous meeting
Held in Amsterdam, Netherlands, 2008-05. - Open Projects
One or more of these projects may be in the process of a formal Call for Comment (CFC), as indicated by the project status. In these cases only, due process requires that any comments be published.
AES-12id-R: Review of AES-12id-2006: AES information document for digital audio measurements - Jitter performance specifications
Project scope: This information document reviews various ways of characterizing and quantifying jitter, and refines several of them for audio purposes. It also attempts to present a common, unambiguous terminology. Its focus includes wideband jitter, baseband jitter, jitter spectra, period jitter, long-term jitter and jitter signatures. Comments are made on jitter transfer through phase-locked loops and on the jitter susceptibility of audio converters.
Assigned to: SC-02-01
, Status: New printing issued with editorial correction to figure 10, 2007-05-08, and add editorial pointers to AES3 and AES-2id for interface jitter.
Intent: Review
, Initiated: 2006
, Target: 2011
Current goal: new printing
, Goal date: 2008-06
AES17-R: Review of AES17-1998 (r2004): AES standard method for digital audio equipment - Measurement of digital audio equipment
Project scope: to provide methods for specifying and verifying the performance of digital audio equipment, and specifically to describe the testing of medium- and high-performance digital audio equipment.
Assigned to: SC-02-01
, Status: Revision ongoing to include (eg) multitone testing. Next draft by mid 2008
Intent: Revision
, Initiated: 2004
, Target: 2009
Current goal: PTD
, Goal date: 2008-05
AES-X102: Liaison with IEC TC100 PT 61606
Project scope: to harmonize digital audio measurement standards through a working relationship between SC-02-01 and IEC TC 100 MT61606 in conjunction with the category-D liaison between AESSC and IEC TC 100.
Assigned to: SC-02-01
, Status: IEC MT61606 meetings have been scheduled alongside AES standards meetings at AES Conventions. Committee draft (CD) for revised IEC 61606-3 has been approved. Final draft expected in September.
Intent: Standard
, Initiated: 1998
, Target: Continuing
Current goal: Status report
, Goal date: 2008-09
AES-X177: AV Sync, Lipsync
Project scope:
Assigned to: SC-02-01
, Status: PTD awaited
Intent: Standard
, Initiated: 2007-05
, Target: 2008
Current goal: PTD
, Goal date: 2008-12
- Liaisons
- New Projects
- New Business
- Date of next meeting
NOTES: - Please make sure you sign the attendance sheet that will be circulated. This sheet shall be passed to the secretariat after the meeting.
- Please make sure that any documents contributed to the meeting are passed to the secretariat who will ensure they are posted to the appropriate Working Group document site.
page updated 2008-09-26
Maintenance Annex
The following projects are subject to periodic review, however no issues have been identified for discussion so far. If you wish to propose a matter for discussion regarding any of these projects, please send an e-mail message to the working group before the meeting, or inform the chair at the beginning of the meeting.
AES-6id-R: Review of AES-6id-2006: AES information document for digital audio - Personal computer audio quality measurements
Status: No action requested or required
Intent: Review
, Initiated: 2006
, Target: 2011
Current goal: Status report
, Goal date: Continuing
AES-X118 : Liaison with ITU-R study group 6P
Status: Continuing
Intent: Liaison
, Initiated: 2001-03
, Target: Continuing
Current goal: Status report
, Goal date: Continuing
|
|
|